cyberneticlibrary

Implement interactive projection mapping

tdmcp-interactive-projection-mappingskillsetup L36
Pantani/tdmcp
What it does

Orchestrate team to implement interactive projection mapping feature

Best for

When you have an approved physical-interaction feature (camera/projector) and need specialized team orchestration beyond generic pipeline.

Inputs
  • · approved feature spec
  • · scope (prototype, build, integrate, QA, all)
Outputs
  • · Layer 1 tool + recipe + CLI integration + docs + live TD validation
Requires
  • · Opus sub-agents (lead, prototyper, builder, integrator, QA)
  • · tdmcp build tools
  • · TouchDesigner
Preconditions

Feature approved in discovery, spec in docs/superpowers/specs/, team roles assigned

Failure modes
  • · Prototype-build scope overlap
  • · Single-writer conflict (registries)
  • · QA finds major defect
  • · Bridge endpoint unexpectedly needed
Trust signals
  • · Hybrid sub-agent workflow (lead local or agent-driven)
  • · Live TD prototype + synthetic tests
  • · QA gates with PASS/UNVERIFIED accounting