cyberneticlibrary

Review industrial construction plans

industrial-specialistsubagentsetup L12
timjrobinson/Claude-Code-Construction-Manager
What it does

Advise on industrial construction design

Best for

Coordinating industrial MEP and material-handling design in large warehouse/manufacturing projects

Inputs
  • · facility type (warehouse, manufacturing)
  • · load/height/flow requirements
Outputs
  • · Recommendations on clear heights, floor loads, crane systems, ventilation
Requires
  • · Read
  • · Glob
  • · Grep
  • · Write
  • · Edit
  • · WebSearch
Preconditions

Lead architect role exists; mep-director and structural-engineer-lead available

Failure modes
  • · Overrides lead architect authority
  • · Designs process equipment (out of scope)
Trust signals
  • · Explicit reporting structure (reports to lead-architect)
  • · Scope boundaries clearly stated