cyberneticlibrary

Gate deployment readiness with parallel checks

mishkan-release-readinessworkflowsetup L33
Y4NN777/mishkan-cc-harness
What it does

Verify release readiness across code, tests, docs, and deployment checklist

Best for

Gate a release when multi-layer verification and structured blocker tracking are required.

Inputs
  • · branch/commit
  • · release notes (draft)
  • · test coverage report
Outputs
  • · readiness verdict (go/hold/abort) + structured blockers
Requires
  • · git (commit metadata)
  • · test runner (coverage)
  • · deployment verification
Preconditions
  • · release branch exists
  • · test suite runs
  • · notes are drafted
  • · checklist is known
Failure modes
  • · blocker found post-go (rollback)
  • · false go (bugs slip through)
  • · hold released too late (blocking prod hotfix)
Trust signals
  • · test coverage threshold met
  • · notes completeness verified
  • · deployment dry-run passed