Gate deployment readiness with parallel checks
mishkan-release-readinessworkflowsetup L3★3
Y4NN777/mishkan-cc-harness ↗What it does
Verify release readiness across code, tests, docs, and deployment checklist
Best for
Gate a release when multi-layer verification and structured blocker tracking are required.
Inputs
- · branch/commit
- · release notes (draft)
- · test coverage report
Outputs
- · readiness verdict (go/hold/abort) + structured blockers
Requires
- · git (commit metadata)
- · test runner (coverage)
- · deployment verification
Preconditions
- · release branch exists
- · test suite runs
- · notes are drafted
- · checklist is known
Failure modes
- · blocker found post-go (rollback)
- · false go (bugs slip through)
- · hold released too late (blocking prod hotfix)
Trust signals
- · test coverage threshold met
- · notes completeness verified
- · deployment dry-run passed