Refresh design standards and craft
foundation-refreshworkflowsetup L3★0
chihirokajiwara-AI/engquest ↗What it does
Refresh foundation systems with minimal user disruption
Best for
Large foundation system upgrades with safety gates and minimal user disruption.
Inputs
- · foundation component specifications
- · upgrade targets
- · optional: migration timeline
Outputs
- · pre-upgrade audit report
- · migration plan (phases, rollback points)
- · post-upgrade verification report
- · user communication (if applicable)
Requires
- · system audit tools
- · migration orchestration
- · verification gates
Preconditions
- · System snapshot available for rollback
- · Downtime window (if required) communicated
- · Rollback procedure documented and tested
Failure modes
- · Pre-upgrade audit finds blockers → upgrade deferred, blockers listed
- · Migration fails mid-phase → rollback to snapshot
- · Post-upgrade verification fails → rollback and investigate
Trust signals
- · Pre-upgrade audit prevents surprises
- · Phased migration enables rollback at checkpoints
- · Post-upgrade verification gates acceptance
- · Automated rollback if verification fails